Methodology/ Organizational Structure

…Steering Committee: ensures inter-Task cooperation and communication with the EC Project ASTARTE; will serve the project until the Final Technical Report. The Steering Committee is formed by the TSUMAPS-NEAM Project…

Read more

Expected Results

The expected results are: long-term PTHA (complete hazard curves), i.e. exceedance probability for different runup or wave-height thresholds, at points distributed along the NEAM coasts; regional hazard maps (hazard intensity with given…

Read more

TER

…the rapidness, efficiency, conciseness, and clarity of the actions and instructions to the public. A Tsunami Emergency Response Plan should also include posttsunami actions and responsibilities for search and rescue, relief, rehabilitation, and recovery….

Read more

Web Services

…50 years equal to 1E-00, 5E-01, 2E-01, 1E-01, 5E-02, 2E-02, 1E-02, 5E-03, 2E-03, 1E-03, 5E-04, 2E-04, 1E-04, 5E-05, 2E-05, corresponding to average return periods (ARP) equal to 0, 72, 224,…

Read more

tsunami propagation

…1,000 km per hour (300 to 600 miles per hour). The distance between successive crests can be as much as 500 to 650 km (300 to 400 miles). However, in the open ocean,…

Read more

Publications

free surface: Numerical analysis of the dynamic effects and fault opening induced by symmetry breaking. Journal of Geophysical Research: Solid Earth, 124, doi: 10.1029/2018JB016512. LINK Glimsdal, S., Løvholt, F., Harbitz, C.B., F. Romano F., Lorito S., Orefice S., Brizuela B., Selva…

Read more